Jockey Club Olympic
Equestrian Facilities
Hong Kong 2007
Constructed sand footing and drainage/profile for the Sha Tin
and Beas River Equestrian Facilities.
Jockey Club Olympic Grass Cross
Country Training Course
Hong Kong 2007
Constructed an equestrian cross country turf training track
within the centre of the Sha Tin Race Course.
Jockey Club Dressage Training Arena
Hong Kong 2006
Installed sub soil drainage and a sand profile before laying turf
on the 7,000 square metre Dressage Training Arena. The Arena
was used for training during the 2008 Olympic Equestrian events.
Hong Kong Cricket Club
Hong Kong 2006
Reconstructed the Club’s sports field which included the
installation of a sub-soil drainage and fully automatic
irrigation system. A 300mm sand profile was laid before returfing
the field using Seashore Paspalum.
Kowloon Cricket Club
Hong Kong 2002
Reconstructed the Club’s sports field which included the
installation of 3000m of drainage. The project also included
the installation of a fully automatic irrigation system and
300mm sand profile. The field was then re-turfed with
Seashore Paspalum.
|
 |
Olympic Equestrian Training Arena

Construction of Hong Kong Cricket Club
Sports Field

Kowloon Cricket Club
|