Caesars Palace, Macau
Kowloon Cricket Club
Fancourt Country Club

Caesars Golf

MACAU: 2008-2009

Birkdale was commissioned to undertake Phase 1 of the landscape redevelopment for the golf course.

Jockey Club Olympic Equestrian Facilities
HONG KONG: 2007

Constructed sand footing and drainage/profile for the Sha Tin and Beas River Equestrian Facilities.

Jockey Club Olympic Grass Cross Country Training Course
HONG KONG: 2007
Constructed an equestrian cross country turf training track within the centre of the Sha Tin Race Course.

Hong Kong Cricket Club
Beijing Olympic Equestrian Centre

Hong Kong Cricket Club
HONG KONG: 2006

Reconstructed the Club’s sports field which included the installation of a sub-soil drainage and fully automatic irrigation system. A 300mm sand profile was laid before returfing the field using Seashore Paspalum.

Jockey Club Dressage Training Arena
HONG KONG: 2006

Installed sub soil drainage and a sand profile before laying turf on the 7,000 square metre Dressage Training Arena. The Arena was used for training during the 2008 Olympic Equestrian events.

Clearwater Bay Golf and Country Club
HONG KONG: 2006

Supplied and laid Zoysia turf as well as constructing a Cart Path for the 18-hole golf course reconstruction programme.

Hong Kong Golf Club

HONG KONG: 2006

Installed drainage, supplied and laid Paspalum and Zoysia turf for the Old Course Reconstruction Programme. 

Asia Golf Driving Range 
HONG KONG: 2004

Constructed an artificial turf golf driving range. The works involved the installation of a sub-soil drainage system prior to the laying of artificial turf. 

Kowloon Cricket Club 
HONG KONG: 2002

Reconstructed the Club’s sports field which included the installation of 3000m of drainage. The project also included the installation of a fully automatic irrigation system and 300mm sand profile. The field was then returfed with Seashore Paspalum. 

Fancourt Country Club 
SOUTH AFRICA: 2000

Provided turf grass construction and maintenance consultancy services for the Gary Player Group who were contracted to the Fancourt Country Club. 

Fuchan Resort

CHINA: 1999


Representing the designer, managed the construction of the 18 hole golf course and rehabilitated the existing Tea plantation and out-of-play landscape areas.